|
|
|
|
|
|
|
|
|
|
|
OpenAirInterface is constantly evolving and you are welcome to contribute to its development.
|
|
|
|
|
|
|
|
# OpenAirInterface Latest Releases #
|
|
|
|
|
|
|
|
The current state of the RAN (`develop` and `master` branches) and the EPC is available at
|
|
|
|
[OAI Feature Sets](https://gitlab.eurecom.fr/oai/openairinterface5g/-/wikis/OpenAirFeatures/).
|
|
|
|
|
|
|
|
# OpenAirInterface Roadmap / Work in progress #
|
|
|
|
|
|
|
|
The main phases are as follows:
|
|
|
|
- Phase 1: "noS1" 5G-NR (with pre-configured gNB and OAI UE, no core network)
|
|
|
|
- Phase 2: E-UTRA - NR dual connectivity (NSA architecture option 3x, with 4G CN) with COTS UE, **ETA Q2-2020**
|
|
|
|
- Phase 3: StandAlone (with 5G CN) with COTS UE, **ETA Q4-2020**
|
|
|
|
|
|
|
|
As intermediate steps to reach these goals, we can mention:
|
|
|
|
|
|
|
|
- Full DL Transmission (ETA June 2020)
|
|
|
|
- Complete validation of DL-HARQ procedures
|
|
|
|
- Integration with higher layers to inject real traffic
|
|
|
|
- Full UL Transmission (ETA July 2020)
|
|
|
|
- Further Improvements (ETA Q3-2020)
|
|
|
|
- gNB: replace dummy scheduler with advanced scheduler
|
|
|
|
- support for multiple users, beamforming
|
|
|
|
- PHY: PTRS, multiple DMRS for PDSCH and PUSCH
|
|
|
|
- UE: Completion of random access procedure
|
|
|
|
- Support for Beamforming (mainly FR2)
|
|
|
|
- Multiple SSBs and RACH occasions
|
|
|
|
- RRC config and MAC scheduling of CSI-RS
|
|
|
|
- UE measurements of CSI-RS and feedback reporting
|
|
|
|
- RRC config and MAC handling of TCI states
|
|
|
|
- Support for MIMO
|
|
|
|
- for SA Mode (ETA Q4-2020)
|
|
|
|
- RRC
|
|
|
|
- SDAP
|
|
|
|
- N2/N3 interface
|
|
|
|
|
|
|
|
|
|
|
|
<table style="border-collapse: collapse; border: none;">
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
# OpenAirInterface Development Projects #
|
|
|
|
|
|
|
|
A more detailed view of the OAI RAN development projects is available on this [Trello board](https://trello.com/b/7kFj0kFp/oai-weekly-meetings).
|
|
|
|
|
|
|
|
|