Limitation of non SI DLSCH allocations in subframe 0/5 to PRBS not around DC...
Limitation of non SI DLSCH allocations in subframe 0/5 to PRBS not around DC (avoid puncturing from PBCH). Placement of SI around DC instead of randomized allocations. Placement of RA allocations at PRB 0-3. Tested DL throughput on 5 MHz to 16 Mbit/s in TM1.
Showing
- openair1/PHY/impl_defs_top.h 1 addition, 1 deletionopenair1/PHY/impl_defs_top.h
- openair2/LAYER2/MAC/eNB_scheduler.c 8 additions, 8 deletionsopenair2/LAYER2/MAC/eNB_scheduler.c
- openair2/LAYER2/MAC/eNB_scheduler_RA.c 7 additions, 2 deletionsopenair2/LAYER2/MAC/eNB_scheduler_RA.c
- openair2/LAYER2/MAC/eNB_scheduler_bch.c 20 additions, 0 deletionsopenair2/LAYER2/MAC/eNB_scheduler_bch.c
- openair2/LAYER2/MAC/eNB_scheduler_primitives.c 5 additions, 1 deletionopenair2/LAYER2/MAC/eNB_scheduler_primitives.c
- openair2/LAYER2/MAC/pre_processor.c 40 additions, 3 deletionsopenair2/LAYER2/MAC/pre_processor.c
Loading
Please register or sign in to comment