... | ... | @@ -17,11 +17,11 @@ The controller will be ready once the message “Now listening on http://0.0.0.0 |
|
|
|
|
|
# Set up and run the OAI-CN
|
|
|
|
|
|
Refer to the [OAI CN tutorial](oai-cn).
|
|
|
Refer to the [OAI CN tutorial](./oai-cn).
|
|
|
|
|
|
# Set up and run the OAI-RAN
|
|
|
|
|
|
Refer to the [OAI RAN tutorial](oai-ran).
|
|
|
Refer to the [OAI RAN tutorial](./oai-ran).
|
|
|
|
|
|
# Connecting a UE
|
|
|
Once the FlexRAN, OAI-CN, and OAI-RAN are running properly, you simply need to wait for a bit for the UE to attach to the network. Once the UE is attached, a list of UE capabilities will show up at the ENB side and some log messages about a UE state change should show up at the controller.
|
... | ... | |