Something went wrong on our end
-
Remi Hardy authoredRemi Hardy authored
TESTBenches.md 1.27 KiB
Table of Contents
- Legacy 1 Bench
- Legacy 2 Bench
- Next Bench for DEV
- Next Bench for CI
- Indoor Live Network Bench
- Outdoor Live Network Bench
Legacy 1 Bench
Purpose : FDD Band 7 and Band 13, LTE-M
Note : Legacy1 and Legacy2 are duplicated so that they can run in parallel, thus avoiding a CI bottleneck
Note : Faraday Cages 1 and 2 are physically the same cage
Legacy 2 Bench
Purpose : TDD Band 40, TM2 2xTX 2xRX
Note : CN can run in a container, could also run on Massive
Next Bench for DEV
Note : Benetel CI can also run on this bench at night
Next Bench for CI
Note : The current test running on Caracal could run on this bench with a N300/N300 setup