Skip to content

WIP: Load gnb

Sakthivel Velumani requested to merge load_gnb into develop

Scheduled downlink in slot 1 to 6 and uplink in slot 7 to 9. Fix to transmit UL and DL DCI in same slot (tested ok with phone). Included command line parameter for dl and ul mcs.

Edited by Sakthivel Velumani

Merge request reports