This section covers status and roadmaps for a collaborative project between ALU, Eurecom and INSA-Lyon related to large-scale system emulation with [OpenAirInterface](OpenAirInterface).
|
|
|
|
|
|
|
|
## Required buidling blocks
|
|
|
|
|
|
|
|
1. UE RRC measurements event-triggering algorithm: This is the starting point for HO implementation. The algorithm for triggering the Measurement Reports needs to be implemented.
|
|
|
|
|
|
|
|
2. PHY Abstraction of UE RRC measurements: Above measurements to be provided in abstraction mode (this is essential for large-scale system simulations)
|
|
|
|
|
|
|
|
3. RRC procedures for supporting measurement signaling between eNB and UE has already been implemented.
|
|
|
|
|
|
|
|
4. Multi-cell simulations in eNB have been tested only by disabling channel models (using -S/-s options). This needs to be tested in abstraction mode with more than 2 eNBs and multiple Ues.
|
|
|
|
|
|
|
|
5. UE detachment from cell and reattachment to new cell needs to be tested using -J option in oaisim. This is critical for HO implementation.
|
|
|
|
|
|
|
|
6. Possibility of using a hack for the X2 interface to avoid delays in full X2 implementation were discussed. This needs to be discussed in detail in future.
|
|
|
|
|
|
|
|
7. A scenario needs to be fixed for the simulation which will allow performance analysis of ALU's ICIC algorithm (URGENT)
|
|
|
|
|
|
|
|
8. There is no link between topology model and channel model, currently in oaisim there is a hexagonal topology by default and this needs to support other topologies (eg: cellular). The channel models also need to support the topology.
|
|
|
|
|
|
|
|
9. Scheduling periodic PUSCH allocations for UEs in order to get sub-band UE feedback requires a change (hack?) in the eNB scheduler.
|
|
|
|
|
|
|
|
10. Changes in MAC/PHY at the UE (and eNB?) to support attachment to new cell during HO needs to be done.
|
|
|
|
|
|
|
|
Return to [OpenAirRoadmaps](OpenAirRoadmaps)
|
|
|
|
|
|
|
|
-- User.RaymondKnopp - 02 Dec 2010 |